Ref. No. 2.1.2 Reinforcing steel straightened from coils

The checklist “Factory production control and monitoring of bending companies that process reinforcing steel in coils” can be downloaded at checklists on the OIB website or at https://www.oib.or.at/kontakt/.

Date: 31.12.2025